国产精品九九久久精品女同_欧美日韩国产大字幕_变态黄色网站在线观看_看一级特黄a大片国产_夜夜欢性恔真人免费视频9_美女视频网站久久久_亚洲性爱av在线无码专区_彩虹视频免费资源在线观看_国产精品穿着丝袜打电话播放_最新中文无码字幕在线热播

中文版 |  English

Production process

Production process

    Technical points

         1, the final size of the cutting and processing of metalworking departments should be correct, all aspects of the steel pipe should meet the technical requirements of

             the product to ensure that the process does not appear in other departments is due to problems arising from the metalworking sector.

         2, the steel pipe in the phosphating process should pay attention to the order of the phosphating pool and soak time in each phosphating pool.

         3, the welding size should be correct, the welding is required to be plastic and polished, no bubbles, welding slag, gaps and so on.

         4, pre-heat spray powder treatment, gunmen one side and the distance to be controlled, products in the oven time should be deployed well, remove the product

            should be gently, to keep the surface of the product does not scratch, no dust, etc. ,

            In the process of transport products are not free to fall, do not bump and so on.

         5, sewing cloth size should be correct, and to ensure that the fabric clean and tidy.

         6, the assembly sequence should be correct, the steel pipe assembly process should be taken lightly, not arbitrarily lit, to avoid being sprayed steel tube surface bumps,

             after the completion of the assembly product balance is reasonable, not rollover.

            (Folding products should be guaranteed to be easily folded, each part will not interfere with each other.For some tables should ensure that the table legs and the box 

            can be naturally placed in the table frame, as required.)


    Process flow

           Handrails: Cutting → Strapping → Double Bending → Correction → Strapping

            Front rail: cutting → binding

            After the crossbar: cutting → binding

           Back rail: cutting → binding

            Wear cloth: cutting → bundling → drilling → deburring → double bend → single bend → roll → correction → strapping

            Rear leg: cutting → strapping → double bend → straight cut → calibration → drilling → deburring → punching → binding

            Metalworking workshop → Phosphating workshop (degreasing → pickling → neutralization → surface conditioning → phosphating) → welding 

            (1, front rail and iron stamping welding 2, rear foot welding pin welding nut 3, after the foot tube and the rear File welding 

            4, the front rail and the armrest welding 5, the rear legs and handrails welding) → → → spray grinding → handrail, before and after the cross-section, 

            after the tube wrapped around the non-woven fabric → assembly

    next item: Employment concept